MODEX® Wiring Systems Time and Motion Study

Synopsis:

In November 2007, Alcan Cable commissioned RSMeans Business Solutions to conduct a Time and Motion study to provide third party confirmation that installing MODEX® Wiring Systems delivered significant cost savings to contractors. The research objective was to evaluate the material and labor costs, processes, and efficiencies associated with installing Alcan’s pre-wired MODEX® Wiring System compared with using the conventional Metal Clad (MC) method. This two-page study outlines the findings of the study, its methodology, and specific detailed costs analysis.

Download

Click here to download this document.

Sales and Support Locator



Sustainability

Alcan Cable has a unique approach to sustainable business practices, which we call the Three Pillars. In our sustainability section, you can read our sustainability reports and our Road to Zero policy, which outlines how we’re helping to ensure the sustainability of tomorrow’s communities.

View Sustainability >>

Products

Learn more about Alcan Cable's products and the markets where they are used.

View Products >>