Alcan Cable commissioned RSMeans Business Solutions, the leading cost consultant and supplier of construction cost information in North America, to conduct two Time and Motion Studies that, taken together, would provide third party confirmation that installing MODEX® products delivers bottom-line savings to contractors. The research objective for these studies was to measure the time and costs of installing Alcan Cable’s modular wiring system against the time and costs of installing commercial electrical wiring using the conventional Metal Clad (MC) method. These detailed pages document the full results of the studies, including methodology, data collection, approach, and key findings.