STABILOY® Projects - Commercial




Revel Hotel & Casino
Atlantic City, NJ


Over 152,000 feet of STABILOY® MC Cable was installed at the 47- story Revel Hotel & Casino, consisting of 1,090 guest rooms, 12 restaurants, 6 pools, 3 theaters, 2 nightclubs, 44 retail shops and a 5,800 seat arena. The ease of installation and the flexibility of MC Cable not only provided total installation cost savings but ensured cable pulling deadlines were met. The project consisted of 5 conductor constructions of STABILOY® MC Cable, ranging in size from #6 AWG to 750 kcmil, with many special configurations.




Lyon Casino
Larchwood, IA

STABILOY® FeederPlex HS® cable was selected for this project to meet an earlier opening date. Because FeederPlex HS cable is a factory produced assembly of plexed aluminum alloy conductors with specially designed insulation, the cable was installed much quicker than original estimates - resulting in total installed cost savings.
 

River Vue
Pittsburgh, PA

This 1955 high rise apartment building was part of the initial renaissance of downtown Pittsburgh. The 218 unit, 295,000 square foot facility was a retrofit project requiring a solution for pulling cable around existing objects and mechanicals.  STABILOY® MC Cable provided the required flexibility for an efficient and successful installation.  And, it delivered cost savings to the owner and contractor of this green and LEED certified renovation.

Sales and Support Locator



Products

Learn more about Alcan Cable's products and the markets where they are used.

View Products >>

Going Green with STABILOY® cable

Find out how STABILOY® aluminum alloy cables can help you "Go Green" on your next project.

View Brochure >>

Sustainability

Alcan Cable has a unique approach to sustainable business practices, which we call the Three Pillars. In our sustainability section, you can read our sustainability reports and our Road to Zero policy, which outlines how we’re helping to ensure the sustainability of tomorrow’s communities.

View Sustainability >>